![](popup/design-engineering/images/project-management-overview.jpg)
The Delta Group undertakes Project Management and Turnkey Construction activities for projects in the Power, Infrastructure, Industrial and Renewable Energy Sectors.
Our services include:
- Civil Department
- Mechanical Department
- Electrical Department
- Controls & Instrumentation
- Project Department
- Safety Department
- QAQC Department
- Workshop
These activities cover the following Sectors:
Projects
170 MW COMBINED CYCLE POWER PLANT, VIJJESHWARAM
Sumitomo Corporation, Japan
SECTORS
Infrstructure
ACTIVITIES
Design and Engineering
Construction
SCOPE OF WORK
Intake Channel and Pump House for Cooling Water.
Supply of Construction Equipment, Manpower, Consumables, Tools & Tackles Etc. for the Project.
Fabrication of C. W. Pipes From Plate (1600 Dia), Under Ground Coating and Installation.
Detailed Engineering of Entire System
Material Supply for Complete Civil Work I.E Cement, Steel, Aggregate Side, Sheeting Material Etc.
Salient Features
Construction of Power Plant on Turnkey Basis Within a Record Time of 18 Months.
270 MW COMBINED CYCLE POWER PROJECT PKG – III, ASSAM
North Eastern Electric Power Corporation, India
SECTORS
Infrastructure
ACTIVITIES
Design and Engineering
Construction
SCOPE OF WORK
Design, Engineering, Supply, Construction, Erection, Testing and Commissioning of Make-up Water System Comprising of Double "D" Intake Well & Pump House,
Supply of All the Civil Material, Water Pumps and All Electrical Auxiliary Material for Pre-stressing of Girders.
Lifting and Shifting of the Girders.
Supply of Equipment and Manpower, Tools and Tackles and Consumables for Construction
SALIENT FEATURES
Turnkey Engineering and Construction of Double "D" Intake Well & Pump House
270 MW COMBINED CYCLE POWER PROJECT PKG – III, ASSAM
North eastern electric power corporation, India
SECTORS
Infrastructure
ACTIVITIES
Design and engineering
Construction
SCOPE OF WORK
Design, engineering, supply, construction, erection, testing and commissioning of bridge super structure and associated electrical and instrumentation work.
Supply of all the civil material, water pumps and all electrical auxiliary material for pre-stressing of girders.
Lifting and shifting of the girders.
Supply of equipment and manpower, tools and tackles and consumables for construction
SALIENT FEATURES
Turnkey engineering and construction of bridge super structure (525 mtr) and 20"/24" x 20 km twin pipeline.
2.5 MW DG BASED POWER PROJECT, ITC – BANGALORE
Bses Limited, India
SECTORS
Power
ACTIVITIES
Construction
Design and Engineering
SCOPE OF WORK
Civil Works, Erection and Commissioning Work of 2.5 MW Diesel Generator supply of all the materials for civil works.
Supply of All Isometric and as Built Drawings.
Supply of All Construction Equipment, Tools and Tackles, Manpower, Consumables, Water and Electricity Project Management Services
SALIENT FEATURES
Erection and Commissioning Works of Diesel Generator.
1 x 20 MW GAS BASED POWER PROJECT FOR MARUTI UDYOG LTD
Bharat heavy electricals limited, India
SECTORS
Power
ACTIVITIES
Logistic management services
Construction
SCOPE OF WORK
Transportation and unloading of gas turbine at site, erection, testing and commissioning of gas turbine with auxiliaries.
Supply of construction equipment, manpower , consumables ,tools and tackles etc, project and construction management.
Co-ordination with statutory authorities.
SALIENT FEATURES
Erection, testing and commissioning of 1 x 20 mw gas turbine.
2 x 30 MW GAS BASED POWER PROJECT AT IOCL, GUJARAT
Bharat heavy electricals limited, India
SECTORS
Power
ACTIVITIES
Construction
SCOPE OF WORK
Erection, testing and commissioning of turbine generators, auxiliaries , piping, c&i , electrical equipment fabrication and erection of steel structures at site.
Supply of construction equipment, manpower including heavy rigging, tools and tackles etc.
Co-ordination with statutory authorities.
SALIENT FEATURES
Erection, testing, commissioning 2 x 30 mw gas turbine generator.
1 x 125 TPH HEAT RECOVERY STEAM GENERATOR
Bharat heavy electricals limited, India
SECTORS
Power
ACTIVITIES
Construction
SCOPE OF WORK
Erection, testing and commissioning of 1 unit of 125 tph heat recovery steam generator with its auxiliaries, stack, piping, insulation, refractory and painting work.
Supply of all the construction equipment, manpower, consumables, ndt services, tools & tackles etc.
SALIENT FEATURES
Installation and associated works for heat recovery steam generators
2 x 115 TPH HEAT RECOVERY STEAM GENERATORS FOR IOC, BARODA.
Indian oil corporation of India
SECTORS
Power
ACTIVITIES
Logistic management services
Construction
SCOPE OF WORK
Handling, transportation, erection, testing and commissioning including application of refractory, insulation, painting and cladding work for heat revoery steam generators
Civil and piping works for HRSG
Supply of construction equipment, manpower, tools & tackles,
Co-ordination and approval with indian boiler inspection agency.
SALIENT FEATURES
Installation and associated civil and piping works for heat recovery steam generators
2 x 130 MW COAL BASED POWER PLANT, JINDAL, KARNATAKA
Badger energy, u.s.a. (division of raytheon, U.S.A)
SECTORS
Power
ACTIVITIES
Design and engineering
Construction
SCOPE OF WORK
Detailed engineering, supply, fabrication,erection, primer painting / galvanizing for complete structural steel for turbine building, coal silo building, pipe racks,service building, warehouse, switch yard , gratings etc.
Detailed engineering and preparation of fabrication drawings.
Supply of all the steel material including high strength bolts.
Fabrication of coal silos including "SS" lining
Supply of construction equipments like cranes, automatic welding machines, manpower, tool & tackles, consumables etc.
Supply and installation of under deck sheets.
Supply, fabrication and erection of screens for pump house.
SALIENT FEATURES
Complete detailed engineering and fabrication
2 x 250 MW COAL BASED POWER PROJECT
Bses ltd.
SECTORS
Power
ACTIVITIES
Construction
Logistic management services
SCOPE OF WORK
Handling site storage yard,
Transportation, erection, testing and commissioning of steam turbine generator, critical hp piping, cw piping and auxiliaries Painting works for the power plant.
Supply of all the construction equipment, tolls and tackles for installation of turbine generator, consumables, ndt services etc.
SALIENT FEATURES
Testing and commissioning of steam turbine generator
2 x 250 MW THERMAL POWER PROJECT AT DAHANU
Bharat heavy electricals limited, India
SECTORS
Power
ACTIVITIES
Construction
SCOPE OF WORK
Erection of power house structures including pre-assembly, site handling and miscellaneous site fabrication work. Supply of construction equipment, manpower, consumables, tools and tackles.
SALIENT FEATURES
Erection of 11,000 mt of power house structures
170 MW COMBINED CYCLE POWER PLANT, VIJJESHWARAM
Sumitomo corporation, Japan
SECTORS
Power
ACTIVITIES
Design and engineering
Construction
Logistic management services
SCOPE OF WORK
Complete civil works including soil investigation and piling work
Structural steel fabrication/erection/painting,
Erection of power plant equipment,
Fabrication and erection of piping, pipe supports
Fabrication of c. W. Pipes from plate (1600 dia), u.g. Coating and installation
Electrical works including switch yard, instrumentation & control, assistance for pre-commissioning and commissioning.
Intake channel and pump house for cooling water.
Supply of construction equipment like batch plant, transit mixer, excavator, submerged arc welding machines, cranes including 150 mt crane etc.,
Supply of manpower, consumables, tools & tackles etc. For the project.
Detailed engineering and fabrication drawings for structural steel work.
Material supply for complete civil work i.e. Cement, steel, aggregate side sheeting material etc.
Structural steel material supply
Client material control.
Client site office.
SALIENT FEATURES
Construction of power plant on turnkey basis within a record time of 18 months.
170 MW COMBINED CYCLE POWER PLANT, VIJJESHWARAM
Deltak, USA
SECTORS
Power
ACTIVITIES
Logistic management services
Construction
SCOPE OF WORK
Supply & fabrication of non pressure parts like ducts, by-pass stack, hrsg panels, chimney based on the design of m/s deltak – usa for m/s sumitomo corporation, Japan
Supply of construction equipment, manpower, tools & tackles, consumables etc.
Transportation within site and assembly of components.
Sand blasting and epoxy primer painting
Installation of internal insulation and ss/cs liner installation
SALIENT FEATURES
Fabrication, sand blasting and epoxy painting
270 MW COMBINED CYCLE POWER PROJECT – PKG – II, ASSAM
North eastern electric power corporation, india
SECTORS
Power
ACTIVITIES
Construction
Design and engineering
SCOPE OF WORK
Complete detailed engineering and fabrication drawings for structural steel work.
Complete civil works within the plant area including foundation building including finishing items, switch yard, gas booster station, control room etc.
Complete structural steel fabrication and erection (rolled and built-up sections from plates), roofing and cladding work etc.
Complete supply of civil materials like cement, aggregates, sand, bricks, doors and windows, flooring, glazing, paints, gratings, special colour coated and insulated roofing and cladding material, gratings, chequred plates etc. For the complete work.
All construction equipments including automatic welding machines for steel built up sections, manpower, tool & tackles, and consumables.
SALIENT FEATURES
6 units of 30 mw gas turbine and 3 units of steam turbine with associated facilities for combined cycle power plant at kathalguri, assam for m/s north eastern electric power corp.
2 x 260 MW RAMAGUNDAM THERMAL POWER PROJECT, BPL GROUP
Marubeni corporation, Japan
SECTORS
Power
ACTIVITIES
Construction
SCOPE OF WORK
Complete civil works for main plant area
Fabrication & erection of all steeel structures for main plant and buildings
SALIENT FEATURES
Main plant civil, fabrication and erection works
Project was suspended due to financial closure not being met.
Complete site levelling, boundary wall and foundation works completed before suspension.
2 x 260 MW RAMAGUNDAM THERMAL POWER PROJECT, BPL GROUP
Marubeni corporation, Japan
SECTORS
Power
ACTIVITIES
Engineering (implosion)
Construction
SCOPE OF WORK
Demolition of tall and other structures including specialised technical back-up for cooling tower demolition by implosion method.
Site grading and leveling work
Nallah diversion work.
Access road for the plant.
All required government approvals for explosives.
All construction equipment, tools and tackle
Manpower and management
Consumables, water and electricity.
SALIENT FEATURES
Controlled implosion of two cooling towers.
360 MW AL-TAWEELAH COMBINED CYCLE POWER PROJECT, ABU DHABI
Bechtel, U.K.
SECTORS
Power
ACTIVITIES
Construction
Logistics management services
SCOPE OF WORK
Construction of main plant civil & electro-mechanical works for gas based combined cycle power plant.
Complete civil works including approx. Of 400 no. Of piles
Complete electro-mechanical works.
Construction of discharge culverts.
Transportation, logistic handling of plant & equipment including gas turbine & steam turbine.
Supply & management of total manpower required for electro-mechanical & construction works.
Management of camp facilities for main contractor and owner.
SALIENT FEATURES
Complete supply, execution and management for electro-mechanical & civil works.